Temporary Pump Station 332B, DADE COUNTY, FL
Design/Build & Construction Services
SCOPE OF SERVICES
This construction services project was a Design-Build procurement that was Designed and Constructed in 90 days. This pump station is built of structural steel. The mechanical equipment includes the following: 4 diesel engine driven 125 CFS pumps, 1 electric motor driven 75 CFS pump, 5 discharge pipes approximately 2,230 feet long each. The water is discharged into a 162 acre detention pond being built as part of the contract.