Temporary Pump Station 332B, Dade County, FL

Design/Build & Construction Services

cs_acoe_temp_pump_station_332b.jpg

SCOPE OF SERVICES

This construction services project was a Design-Build procurement that was Designed and Constructed in 90 days. This pump station is built of structural steel. The mechanical equipment includes the following: 4 diesel engine driven 125 CFS pumps, 1 electric motor driven 75 CFS pump, 5 discharge pipes approximately 2,230 feet long each. The water is discharged into a 162 acre detention pond being built as part of the contract.

PUBLIC / GOVERNMENT
WATER TREATMENT


GENERAL CONTRACTOR:

Harry Pepper & Associates, Inc.

CLIENT:
South Florida Area Office
Jacksonville District
US Army Corps of Engineers
4400 PGA Boulevard, Suite 203
Palm Beach Gardens, FL 33410
Contact: George Cooper,
Area Engineer
Phone: 561.626.5299

PROJECT DURATION:
January 21, 2000 – April 12, 2000

CONTRACT AMOUNT:
$9,439,355

 

Harry Pepper & Associates - Technical solutions, Relationships, Quality Service, Value Engineering, Experience, Project Schedule & Coordination, Expertise

 

case_box_check.gif Design/Build
case_box.gif Bid Build
case_box_check.gif New Construction
case_box.gif Retrofit/Renovation
case_box.gif Electrical Construction
case_box_check.gif Mechanical Construction
case_box.gif Facilities Services
case_box.gif Consulting Services
case_box.gif HVAC Services