Seminole Big Cypress Indian Reservation, Hendry County, FL

Construction Services: Western Water Conservation Restoration

SCOPE OF SERVICES

Harry Pepper provided construction services for 10 miles of levee and canals, 14 gated control and overflow structures, 1 twinbarrel inverted siphon with inflow and outfall structures, 1 five-barrel equalization structure and 10 pump stations ranging in size from 12-42" within a project area of 700 acres. A dual pipe bypass Siphon was installed under the existing feeder canal.

MANUFACTURING / INDUSTRIAL
WATER TREATMENT


GENERAL CONTRACTOR:

Harry Pepper & Associates, Inc.

CLIENT:
South Florida Area Office
Jacksonville District
US Army Corps of Engineers
4400 PGA Boulevard, Suite 203
Palm Beach Gardens, FL 33410
Contact: George Cooper,
Area Engineer
Phone: 561.626.5299

PROJECT DURATION:
Nov 28, 2006 - Nov 8, 2008

CONTRACT AMOUNT:
$20,390,223.00

 

Harry Pepper & Associates - Technical solutions, Relationships, Quality Service, Value Engineering, Experience, Project Schedule & Coordination, Expertise

 

case_box.gif Design/Build
case_box_check.gif Bid Build
case_box_check.gif New Construction
case_box.gif Retrofit/Renovation
case_box.gif Electrical Construction
case_box.gif Mechanical Construction
case_box.gif Facilities Services
case_box.gif Consulting Services
case_box.gif HVAC Services