Wysong Adjustable Water Conservation Structure,
Sumter County, FL

Construction Services

Construction Services for Wysong Adjustable Water Conservation Structure in Sumter County, Florida

SCOPE OF SERVICES

Harry Pepper provided construction services for the removal and replacement of old lock and dam facilities. An entire river crossing was dewatered, with the exception of the lock, utilizing 500 LF of sheet pile wall. In addition, a new lock and dam control house was constructed along with a boat ramp and associated site work.

MANUFACTURING / INDUSTRIAL
WATER TREATMENT


GENERAL CONTRACTOR:

Harry Pepper & Associates, Inc.

CLIENT:
South West Florida Water
Management District
2379 Broad Street
Brooksville, FL 34604
Contact: Lisann Morris,
Senior Professional Engineer
Phone: 352.796.7211

PROJECT DURATION:
November 15, 2001 –
June 15, 2002

CONTRACT AMOUNT:
$1,177,677.30

 

Harry Pepper & Associates - Technical solutions, Relationships, Quality Service, Value Engineering, Experience, Project Schedule & Coordination, Expertise

 

case_box.gif Design/Build
case_box_check.gif Bid Build
case_box_check.gif New Construction
case_box.gif Retrofit/Renovation
case_box.gif Electrical Construction
case_box.gif Mechanical Construction
case_box.gif Facilities Services
case_box.gif Consulting Services
case_box.gif HVAC Services